Skip to content

Commit 7d3e19e

Browse files
bhiderVesaJuvonen
authored andcommitted
Updated portal-rollout.md (SharePoint#1081)
Corrected typos
1 parent 56dd09e commit 7d3e19e

File tree

1 file changed

+4
-4
lines changed

1 file changed

+4
-4
lines changed

docs/solution-guidance/portal-rollout.md

Lines changed: 4 additions & 4 deletions
Original file line numberDiff line numberDiff line change
@@ -26,14 +26,14 @@ Often customers did run massive stress tests on their SharePoint on-premises bas
2626
- SharePoint Online will see the load test as a denial of service attack and simply will block the user or even worse the complete tenant
2727
- If the load test is not getting blocked it will be throttled resulting in hard to interpret test results
2828
- SharePoint Online will dynamically scale its underlying infrastructure which works great, but not if you suddenly do a massive load increase. The scaling back-end model needs time to absorb increased load
29-
- Such a performance test is just a one-time validation whereas you portal will keep on evolving ,it's better to rely on build in portal telemetry so that you're able to continuously follow-up on your portal performance. It's also hard to build a load test that represents a real usage pattern.
29+
- Such a performance test is just a one-time validation whereas you portal will keep on evolving ,it's better to rely on built in portal telemetry so that you're able to continuously follow-up on your portal performance. It's also hard to build a load test that represents a real usage pattern.
3030

3131
The recommended approach for rolling out your new portal is by using a phased roll-out plan combined with built in portal telemetry to measure portal performance while more and more users are added. The next chapter will provide more details around this approach.
3232

3333
## Recommendation: use a phased portal roll-out strategy combined with portal telemetry
34-
A commonly used model for rolling out new functionality is using a phased approach which typically consists out of:
34+
A commonly used model for rolling out new functionality is using a phased approach which typically consists of:
3535
- A **pilot** wave: this is the first time the portal is opened up to a group of selected key users. It's important to get a set of representative, critical, key users that can provide the first feedback
36-
- One of more **end user** waves: the number of waves you have is depending on how many users you'll be having combined with the model you're following. We see companies aligning their roll-out waves with their organization structure, other companies are aligning by country/region...in the end the thing that matters most is the fact that you're gradually adding new users to the portal
36+
- One or more **end user** waves: the number of waves you have depends on how many users you'll be having combined with the model you're following. We see companies aligning their roll-out waves with their organization structure, other companies are aligning by country/region...in the end the thing that matters most is the fact that you're gradually adding new users to the portal
3737

3838
Below picture shows a nice gradual roll-out plan. Note that this also takes in account that typically end-user waves have less actual users then invited users.
3939

@@ -44,4 +44,4 @@ The above phased approach will give you time to absorb feedback and make adjustm
4444
## Additional resources
4545
<a name="bk_addresources"> </a>
4646

47-
- [Capacity planning and load testing SharePoint Online](https://support.office.com/en-us/article/Capacity-planning-and-load-testing-SharePoint-Online-c932bd9b-fb9a-47ab-a330-6979d03688c0?ui=en-US&rs=en-US&ad=US)